The underfloor range includes the UEBS screed-flush duct systems. In conjunction with mounting components and accessories, they are used for horizontal cable routing in dry-cleaned and damp-cleaned floors in rooms with office traffic loads. The removable covers gives users free access to the installed components and lets them be flexibly positioned. They consist of pre-assembled side profiles with rubber seals, dummy covers, crossbeams, screed anchors and carpet profiles. The side profiles are available in three versions for different key requirements. The items are assembled from a channel, two side walls or a tray and four levelling supports.
UEBS Underfloor Duct System

UEBS
Screed-covered duct, one section

UEBSMSP S
Side walls, sheet steel

UEBSMSP
Side walls, plastic

UEBSMSW
Floor tray

UEBSMD 122R
Assembly cover, round

UEBSMD 185V
Assembly cover, angular

UEBSMD 260R
Assembly cover, round

UEBSMD 260V
Assembly cover, angular

UEBSMD 307R
Assembly cover, round

UEBSBMD 185V
Assembly cover, dummy, angular

UEBSBMD 260R
Assembly cover, dummy, round

UEBSBMD 260V
Assembly cover, dummy, angular

UEBSBMD 307R
Assembly cover, dummy, round

UEBSST
Levelling support

UEBSBD
Dummy cartridge, angular

UEBSPT
Cartridge edging

UEBSMA
Mounting kit T branch

UEBSMB
Mounting kit 90° bend

UEBSAM60 R
Add-on unit for screed-flush duct

UEBSAM60 V
Add-on unit for screed-flush duct

UEBSES
End piece

UEBSESK
End piece, cartridge

UEBSV
Corner connector

UEBSV S
Connector

UEBSVE S
Corner connector

UEBSVMB S
Corner connector plate

UEBSE
Earth connector

UEBSEL
Earthing lug set

UGM SLF
Subsonic noise sleeve socket - levelling support

UEBSD
Dummy cover

UEBSPT 3
Carpet edge with abutting edge 0/3 mm

UEBSQT
Cross beam

UEBSQT S
Cross beam

UEBSQTF S
Cross beam

UEBSTR
Separating strip

UEBSEA
Screed anchor

UEBSPGD
Rubber seal
Vorteile
- Three different side profile designs
- Reliable impact sound decoupling
- Safe EMC cable routing
- Easy installation and removal of installation devices
- Individual room design through flexible cable routing while maintaining barrier-free access
- For dry-cleaned or wet-cleaned floors
- Low space requirements for electrical installations
Downloads
de
de
en
de
en
de
en
de
en
de
en
de

Electrical and Electronic Devices – Information from Manufacturers for Commercial Users
Declaration
PDF (106.06 KB)
DownloadDownload
EC Declaration of Conformity for Underfloor systems
Installation equipment for electric cables and circuits

Underfloor Systems - Catalogue
Catalogue

Notice for types of protection and floor maintenance
Notice for installation units

Technical Information for Flush-Mounted Duct Systems
Technical Information

Installation Instructions Screed-Flush Duct System UEBS
Assembly Instructions

VDE Certificate 40039678 UEBS
Certificate
PDF (260.01 KB)
DownloadDownloadBIM- und CAD-Data
BIM Data Screed-Flush Duct Systems
BIM Data
ZIP (4.77 MB)
DownloadDownload
Consulting, planning, design
We work with you to find the optimum solution for your requirements.
More about our consulting service

Installation first-hand
We’ll be happy to assign regionally based team members to your project.
Our installation services

Seamless integration of our products
We provide high‑quality CAD and BIM data for all our fit‑out products.
More about BIM & CAD
References from the cable support sector

Infrastructure
Airport Frankfurt
With almost 60 million passengers (2023), Frankfurt Airport is Germany's largest and Europe's sixth largest airport. In 2026, passenger numbers, which have fallen due to the pandemic, are expected to return to pre-crisis levels (~70.5 million) and continue to grow from then on.
Airport Frankfurt
Infrastructure
Extension of the subway line U5
For decades, the current U5 subway line connected the eastern city center with the east and northeast of Berlin. Plans to extend the line to the west date back to the 1970s, but it was only with the reunification of Germany that these could be realized.
Extension of the subway line U5
Commercial/office building
EDGE East Side Tower
The Berlin skyline is growing and another building was added in November 2023. With the 142 m high EDGE East Side Tower Berlin near ‘Warschauer Brücke’, one of Berlin's tallest buildings was built in just under 4 years. Particularly striking: the staircase-like curtain wall with almost complete glazing.
EDGE East Side Tower
Infrastructure
City S-Bahn S21 at Berlin Central Station
Berlin's main railway station is to be better connected to public transport. This is the goal of the construction of the new S-Bahn line S21, the so-called City S-Bahn. This line, which runs from north to south, connects the northern stations Wedding and Westhafen directly with the Central Station.
City S-Bahn S21 at Berlin Central Station

Our finishing services
Whether apartment blocks, office complexes or industrial plants: as your reliable partner for numerous applications and construction phases, we support you in every project with expert advice and support services. This allows you to concentrate fully on your core business.
Building extension Price list

de
en
Price list 2026 Building extension
Valid from February 1st, 2026
PDF
Choose languageChoose languagede
en
Price list 2026 Building extension (Excel)
Valid from February 1, 2026
ZIP
Choose languageChoose language
Whatever you’re planning: we look forward to your enquiry.
Count on our expert advice for every application—so your daily work becomes easier and the satisfaction of great results grows.
Find contact person
Career at PohlCon: Become part of something big
The people who work with us have mastered their craft from the ground up. They are the heart of our company. Our culture is defined by customer‑focused processes and flat hierarchies. And we treat our colleagues just as we treat our customers: openly, honestly and as equals.
Career opportunities