Cleaning Sockets

UBSK V E
Cleaning socket, single, angular, levelable

UBSK VP E
Cleaning socket, single, angular, levelable

UBST R WD
Cleaning socket, single, round, levelable

UET120 WD
Tube

UETD120 WD
Tube cover
Downloads
de
de
en
de
en
de
en
de
en

Electrical and Electronic Devices – Information from Manufacturers for Commercial Users
Declaration
PDF (106.06 KB)
DownloadDownload
EC Declaration of Conformity for Underfloor systems
Installation equipment for electric cables and circuits

Units for screed and hollow floors - Technical information
Technical Information

Underfloor Systems - Catalogue
Catalogue

Installation Instruction Cleaning Socket
Cleaning socket angular and round
BIM- und CAD-Data
BIM Data Installation Boxes
BIM Data
ZIP (13.12 MB)
DownloadDownload
Consulting, planning, design
We work with you to find the optimum solution for your requirements.
More about our consulting service

Installation first-hand
We’ll be happy to assign regionally based team members to your project.
Our installation services

Seamless integration of our products
We provide high‑quality CAD and BIM data for all our fit‑out products.
More about BIM & CAD
References from the cable support sector

Infrastructure
Airport Frankfurt
With almost 60 million passengers (2023), Frankfurt Airport is Germany's largest and Europe's sixth largest airport. In 2026, passenger numbers, which have fallen due to the pandemic, are expected to return to pre-crisis levels (~70.5 million) and continue to grow from then on.
Airport Frankfurt
Infrastructure
Extension of the subway line U5
For decades, the current U5 subway line connected the eastern city center with the east and northeast of Berlin. Plans to extend the line to the west date back to the 1970s, but it was only with the reunification of Germany that these could be realized.
Extension of the subway line U5
Commercial/office building
EDGE East Side Tower
The Berlin skyline is growing and another building was added in November 2023. With the 142 m high EDGE East Side Tower Berlin near ‘Warschauer Brücke’, one of Berlin's tallest buildings was built in just under 4 years. Particularly striking: the staircase-like curtain wall with almost complete glazing.
EDGE East Side Tower
Infrastructure
City S-Bahn S21 at Berlin Central Station
Berlin's main railway station is to be better connected to public transport. This is the goal of the construction of the new S-Bahn line S21, the so-called City S-Bahn. This line, which runs from north to south, connects the northern stations Wedding and Westhafen directly with the Central Station.
City S-Bahn S21 at Berlin Central Station

Our finishing services
Whether apartment blocks, office complexes or industrial plants: as your reliable partner for numerous applications and construction phases, we support you in every project with expert advice and support services. This allows you to concentrate fully on your core business.
Building extension Price list

de
en
Price list 2026 Building extension
Valid from February 1st, 2026
PDF
Choose languageChoose languagede
en
Price list 2026 Building extension (Excel)
Valid from February 1, 2026
ZIP
Choose languageChoose language
Whatever you’re planning: we look forward to your enquiry.
Count on our expert advice for every application—so your daily work becomes easier and the satisfaction of great results grows.
Find contact person
Career at PohlCon: Become part of something big
The people who work with us have mastered their craft from the ground up. They are the heart of our company. Our culture is defined by customer‑focused processes and flat hierarchies. And we treat our colleagues just as we treat our customers: openly, honestly and as equals.
Career opportunities