Fastenings

KHA 8
Profile rail 40x22 mm, perforated, for escape route installation

SD
Expansion anchor, maintenance of function

KLR
Clamp fastening set, maintenance of function

KLS
Clamp fastening set, maintenance of function

GB
Threaded rod, DIN 976-1, maintenance of function

VAS-SH
Perforated bush for shear connector, maintenance of function

VM
Rod coupling

HS18
Tee-head bolt

AM 18
Channel nut

AMF 18
Channel nut with spring

SAZ
Drop-in anchor, maintenance of function

VAS-AS
Shear connector rod, stone, maintenance of function

VAS-BS
Shear connector rod, brush, maintenance of function

VAS-M
Shear connector mortar, maintenance of function

VA-AP
Shear connector rod, pistol

Consulting, planning, design
We work with you to find the optimum solution for your requirements.
More about our consulting service

Installation first-hand
We’ll be happy to assign regionally based team members to your project.
Our installation services

Seamless integration of our products
We provide high‑quality CAD and BIM data for all our fit‑out products.
More about BIM & CAD
References from the cable support sector

Infrastructure
Airport Frankfurt
With almost 60 million passengers (2023), Frankfurt Airport is Germany's largest and Europe's sixth largest airport. In 2026, passenger numbers, which have fallen due to the pandemic, are expected to return to pre-crisis levels (~70.5 million) and continue to grow from then on.
Airport Frankfurt
Infrastructure
Extension of the subway line U5
For decades, the current U5 subway line connected the eastern city center with the east and northeast of Berlin. Plans to extend the line to the west date back to the 1970s, but it was only with the reunification of Germany that these could be realized.
Extension of the subway line U5
Commercial/office building
EDGE East Side Tower
The Berlin skyline is growing and another building was added in November 2023. With the 142 m high EDGE East Side Tower Berlin near ‘Warschauer Brücke’, one of Berlin's tallest buildings was built in just under 4 years. Particularly striking: the staircase-like curtain wall with almost complete glazing.
EDGE East Side Tower
Infrastructure
City S-Bahn S21 at Berlin Central Station
Berlin's main railway station is to be better connected to public transport. This is the goal of the construction of the new S-Bahn line S21, the so-called City S-Bahn. This line, which runs from north to south, connects the northern stations Wedding and Westhafen directly with the Central Station.
City S-Bahn S21 at Berlin Central Station

Our finishing services
Whether apartment blocks, office complexes or industrial plants: as your reliable partner for numerous applications and construction phases, we support you in every project with expert advice and support services. This allows you to concentrate fully on your core business.
Building extension Price list

de
en
Price list 2026 Building extension
Valid from February 1st, 2026
PDF
Choose languageChoose languagede
en
Price list 2026 Building extension (Excel)
Valid from February 1, 2026
ZIP
Choose languageChoose language
Whatever you’re planning: we look forward to your enquiry.
Count on our expert advice for every application—so your daily work becomes easier and the satisfaction of great results grows.
Find contact person
Career at PohlCon: Become part of something big
The people who work with us have mastered their craft from the ground up. They are the heart of our company. Our culture is defined by customer‑focused processes and flat hierarchies. And we treat our colleagues just as we treat our customers: openly, honestly and as equals.
Career opportunities