UBEBES duct end part

End piece, adaptable to floor cover thickness (25mm) for closing the screed-flush brush duct.

data sheet
Continously hot galvanized (Sendzimir process) (DIN EN 10346)
HminMinimum installation heightN levelling rangewidthweight
UBEBES 85-25S80 mm25 mm250 mm0,88 kg
Whatever you plan.

We accompany you with expert advice, for every application. For day-to-day work in which much becomes easier and for increasing gratification in successful results.

Consultant Search
Memolist
No items in memolist
inclusive accessoires